Short answer: build every machine from a structured bill of materials (BOM): parts, sub-assemblies, assemblies and the machine itself. Give each part a price, and let the cost roll up level by level. Then the machine’s cost is calculated, not estimated, and it stays current when part prices change.
Why machine costing is hard
A single lathe or press can contain hundreds of parts: bought-out fasteners and bearings, machined shafts and gears, castings, and complete units such as a headstock or a gearbox. When the BOM lives in spreadsheets, one price change has to be found and updated in many places, and the quoted price drifts away from the real cost.
A four-level structure
- Parts: each with a part number, category, source type (in-house or bought-out), HSN code, price, drawing and store location.
- Sub-assemblies: small groups of parts, such as a pump and motor sub-assembly.
- Assemblies: built from parts and sub-assemblies, such as a headstock assembly.
- Machines: built from assemblies plus loose parts, with standard and optional accessories.

Get the part master right first
Costing is only as good as the part data underneath it. Decide how each part’s price is taken (for example average, minimum, maximum or an individual price), record the HSN code for GST, and keep drawings and store locations with the part so the same record serves design, purchase and stores.

How Prism Mechline handles BOM costing
Prism Mechline keeps the product structure in four levels: parts, sub-assemblies, assemblies and machines. A machine lists its assemblies, loose parts, standard accessories and optional accessories, and costs roll up from parts into assemblies and then into the machine.

Frequently asked questions
What is a bill of materials (BOM)?
A BOM is the structured list of every part, sub-assembly and assembly, with quantities, needed to make a product.
What is a multi-level BOM?
A multi-level BOM nests items inside each other: parts make sub-assemblies, sub-assemblies and parts make assemblies, and assemblies make the finished machine.
How does BOM costing stay up to date?
When the cost rolls up from part prices, a change to a part’s price flows through to every assembly and machine that uses it.